Because the air is already wet. Drying works by moving moisture from assemblies into air that can hold it, and Gulf air in a Pasadena summer holds little more. Equipment runs longer, readings fall slower, and the slab edge is the last assembly to release. Drying is therefore verified by meter over days rather than promised by a calendar, and a scope that guarantees dry-by-Friday in August is selling a date, not a reading.
Prefer to talk later? Leave your details and an independent local pro will call you back. No charge to you, no obligation.
Spencer Highway Restoration is a free referral service. Submitting this form connects you with independent local contractors who provide the work.